Home / EV charger installation

EV charger installation
in Qatar

AC and DC chargers from 7 to 400 kW for workplaces, showrooms, malls, compounds and public sites. Design, supply, approvals, installation and maintenance by one team.

7 DC chargers liveKahramaa approvalsUPDA Grade-A engineers7–400 kW
Project photos & list of projects →
DC fast-charging hub in Doha by EVision Energy
What we do

EV charger installation in Qatar, from survey to switch-on.

EVision Energy supplies, installs and maintains AC and DC electric vehicle chargers from 7 to 400 kW across Qatar, for workplaces, showrooms, malls, compounds, hotels and public sites. We handle the design, the load calculation, the approvals and the commissioning, so the charger is approved, energised and running.

01

AC chargers 7–22 kW

Wall-mounted and pedestal AC chargers for offices, compounds, hotels and residential buildings.

02

DC fast chargers 30–400 kW

DC fast and ultra-fast charging for showrooms, malls, fleets and public stations, with civil works and canopies.

03

Supply of premium brands

Premium charger brands, genuine and warrantied.

04

Design & load calculation

Site survey, cable sizing, protection and load study before any equipment is ordered.

05

Approvals end to end

Tarsheed, municipality and Kahramaa approvals managed by our UPDA Grade-A engineers.

06

Maintenance & support

Preventive maintenance visits, fault response and firmware support after handover.

0DC fast chargers live in Qatar
0+AC chargers live
7–7kW range we install
0+years of team experience in Qatar
Socket to switch-on

Plugged in, approved, energised.

DC fast chargers from 30 to 400 kW, installed, approved with Tarsheed, the Municipality and Kahramaa, and switched on by our engineers.

Approvals

The approval path, handled for you.

Every public or commercial charger in Qatar needs approvals before it can be energised. We prepare the drawings and submissions and follow them to the end.

  1. 01

    Tarsheed

    Energy-efficiency approval for the charger.

  2. 02

    Municipality

    Site and civil approvals where needed.

  3. 03

    Kahramaa

    Load approval and connection.

  4. 04

    Install & commission

    Cabling, protection, testing and handover.

  5. 05

    Operate & maintain

    Preventive visits and fast response.

Live across Qatar

DC stations we switched on.

7 DC fast chargers across 5 sites — Olympic Tower and Al Hazm Mall run two each — are live with EVision’s installation, approvals and energisation. Tap a site to open its photo.

All DC projects in the gallery
Project photos & list of projects →
FAQ

Questions we get every week.

How much does it cost to install an EV charger in Qatar?

It depends on the charger power, the distance from the main panel, cabling, civil works and approvals. A home AC charger is a small project; a DC fast charger needs a larger supply and civil works. Send us the location and a photo of your electrical room on WhatsApp and we will give you a clear quote.

Do I need Kahramaa approval for an EV charger?

Yes. Commercial and public chargers need Kahramaa load approval, and usually Tarsheed and municipality approvals too. We prepare and follow all of them as part of the project.

How long does an EV charger installation take?

A typical AC installation takes one to two days once approvals are in place. DC fast chargers take longer because of civil works and Kahramaa connection; we give you a timeline after the site survey.

Which charger brands do you install?

We supply premium charger brands, and we can also install and maintain chargers you already own after checking compatibility with your site.

What is the difference between AC and DC charging?

AC chargers (7–22 kW) are ideal where cars park for hours, such as homes, offices and hotels. DC fast chargers (30–400 kW) charge much faster and suit showrooms, malls, fleets and public stations.

Do you maintain chargers after installation?

Yes. We offer preventive maintenance visits and fault response for chargers we install and for existing sites.

Ready to switch it on?

Send us the site location and a photo. We reply the same day.